Construction Costs in Brooklyn Park, MN 2026

Estimate renovation and building costs in Brooklyn Park. Labor input: $38.35/hr, the BLS OEWS May 2025 median wage for carpenters, construction laborers and construction supervisors in the Minneapolis-St. Paul-Bloomington, MN-WI metro; HammerIO's modeled material cost index is 101.

$38.35

Median construction wage/hr (BLS May 2025)

101

Material Cost Index

$223,359

Typical Home Value (est.)

103

Cost of Living Index

Construction trade wages, Minneapolis-St. Paul-Bloomington, MN-WI metro (BLS OEWS May 2025)

Median hourly wages published by the U.S. Bureau of Labor Statistics for the Minneapolis-St. Paul-Bloomington, MN-WI metropolitan area, which includes Brooklyn Park, compared with the U.S. median for each occupation. These are what employees earn, not what contractors bill: a contractor's hourly rate adds overhead, insurance, equipment and profit. The calculator below scales its labor share by the local-to-national ratio for carpenters, construction laborers and construction supervisors (1.28 here).

Occupation (SOC)Metro medianMN medianU.S. medianvs U.S.
Carpenters (47-2031)$35.61$31.22$29.12+22%
Construction Laborers (47-2061)$29.79$28.97$22.66+31%
First-Line Supervisors of Construction Trades and Extraction Workers (47-1011)$49.66$46.93$38.42+29%
Electricians (47-2111)$39.37$37.58$30.38+30%
Plumbers, Pipefitters, and Steamfitters (47-2152)$48.86$45.39$30.67+59%
Heating, Air Conditioning, and Refrigeration Mechanics and Installers (49-9021)$37.25$36.71$29.33+27%
Roofers (47-2181)$36.25$35.81$26.65+36%
Painters, Construction and Maintenance (47-2141)$29.26$27.54$23.75+23%
Drywall and Ceiling Tile Installers (47-2081)$30.81$29.46$28.33+9%
Cement Masons and Concrete Finishers (47-2051)$34.98$32.13$27.41+28%
Brickmasons and Blockmasons (47-2021)$47.10$45.78$29.87+58%
Tile and Stone Setters (47-2044)$34.50$33.92$26.77+29%
Floor Layers, Except Carpet, Wood, and Hard Tiles (47-2042)$30.37$28.55$27.15+12%
Insulation Workers, Floor, Ceiling, and Wall (47-2131)$28.00$26.13$23.62+19%
Sheet Metal Workers (47-2211)$35.08$35.08$29.71+18%

Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 estimates for CBSA 33460 (Minneapolis-St. Paul-Bloomington, MN-WI). "n/a" means BLS suppressed the metro estimate; the state column still applies and "vs U.S." then compares the state median. Retrieved September 2026 via the BLS Public Data API.

Brooklyn Park Overview

Population

86,478

Climate Zone

Cold (Zone 6)

Seismic Risk

low

Median Household Income

$49,597

Brooklyn Park Remodeling Cost Estimator

Leave blank for typical kitchen remodel size

Cost Breakdown

Materials$21,210
Labor$19,641
Permits (4%)$1,634

Estimated Total Cost

$42,485

Mid-range Kitchen Remodel280 sq ft in Brooklyn Park

Materials

$21,210

50% of total

Labor

$19,641

46% of total

Permits

$1,634

~$1,158 modeled allowance

13% Above National Average

The same kitchen remodel at the national average would cost approximately $37,492. HammerIO's model places Brooklyn Park above the national baseline because of its modeled labor and material factors.

View Minnesota Statewide Costs

Compare Brooklyn Park costs with the Minnesota state average and other cities.

Project Cost Comparison: Brooklyn Park vs National Average

Project TypeBrooklyn Park EstimateNational BaselineDifference
Kitchen Remodel$43,915$35,000+25%
Bathroom Remodel$19,000$18,000+6%
Roof Replacement$16,000$15,000+7%
Whole House Paint$4,000$3,800+5%
Flooring Install$7,500$7,000+7%
Deck Build$12,500$12,000+4%

Material Prices in Brooklyn Park

Concrete

$140 /cubic yard

$1 below the estimated Minnesota average of $141/yd³

Lumber

$5.48 /board foot

$0.07 below the estimated Minnesota average of $5.55/BF

Popular Projects in Brooklyn Park

🏠

#1 Roof Replacement

Common project type to budget for in Brooklyn Park

🎨

#2 Interior Painting

Common project type to budget for in Brooklyn Park

📐

#3 Room Addition

Common project type to budget for in Brooklyn Park

Construction Cost Overview for Brooklyn Park, MN

Construction and renovation costs in Brooklyn Park, MN are modeled here with a cost of living index of 103 and a material cost index of 101 (where 100 represents the national baseline). With a BLS OEWS May 2025 median construction wage of $38.35 per hour (carpenters, laborers and supervisors, Minneapolis-St. Paul-Bloomington, MN-WI metro) and a typical home value estimate of $223,359, homeowners in Brooklyn Park should plan their renovation budgets carefully using local pricing data.

Brooklyn Park sits in IECC Climate Zone 6 (Cold), which influences insulation requirements, HVAC sizing, and overall material choices for both new construction and remodeling projects. Low seismic risk in the model. The median household income of $49,597 in Brooklyn Park means that a mid-range kitchen remodel at $43,915 represents approximately 89% of annual household income.

HammerIO uses a modeled permit allowance of $1,158 for Brooklyn Park; actual fees vary by project scope, valuation, and the local fee schedule. Major renovations involving structural, electrical, or plumbing work generally require permits, so confirm with the local building department. Scheduling outside peak season may improve contractor availability and pricing flexibility.

Other Cities in Minnesota

Methodology & Construction Data Sources

How we calculate Brooklyn Park construction costs: These are planning estimates from HammerIO's cost model: national project baselines adjusted by modeled regional labor and material factors for Brooklyn Park. Public data sources below are used as benchmarks and context; the city figures are estimates, not official statistics or contractor quotes.

  1. Labor rates, the calculator uses BLS Occupational Employment and Wage Statistics (May 2025) median hourly wages for the Minneapolis-St. Paul-Bloomington, MN-WI metro, scaling its labor share by the local-to-national ratio (1.28) for carpenters, construction laborers and construction supervisors. These are employee wages, not contractor billing rates; the full trade table is above.
  2. Materials pricing trends are checked against the BLS Producer Price Index (PPI) for Construction Materials, (national price indexes for materials such as lumber, concrete, and steel); the city material index is a modeled regional adjustment.
  3. Building permit costs are shown as a modeled allowance; confirm actual fees with the Brooklyn Park building department's current fee schedule.
  4. Regional cost adjustment uses HammerIO's modeled labor-rate and material-index factors for Brooklyn Park; it is not a licensed proprietary city cost index.
  5. Building codes and standards cross-referenced with EPA Renovation, Repair and Painting (RRP) Rules and OSHA Construction Safety Standards.

Authoritative construction cost data sources:

Cost Disclaimer: Estimates are modeled planning ranges for Brooklyn Park, not local quotes. Actual project costs depend on site conditions, design complexity, contractor availability, material grades, and permitting timelines. Always obtain 3+ contractor bids before committing to any project. Actual prices can differ substantially from these estimates.

Reviewed by Rowan Ashby · Last updated 2026

Frequently Asked Questions

How much does a kitchen remodel cost in Brooklyn Park, MN?
HammerIO's planning model estimates a mid-range kitchen remodel in Brooklyn Park, MN at approximately $43,915. Budget renovations start around $30,740, while premium remodels with custom cabinetry and high-end appliances can reach $65,873 or more. The labor input is $38.35/hour, the BLS OEWS May 2025 median wage for carpenters, construction laborers and construction supervisors in the Minneapolis-St. Paul-Bloomington, MN-WI metro; contractor billing rates run higher and vary.
What is the average construction labor rate in Brooklyn Park?
The BLS OEWS May 2025 median hourly wage for general construction work in the Minneapolis-St. Paul-Bloomington, MN-WI metro is $38.35 (average of the carpenter, construction laborer and construction supervisor medians), 28% above the U.S. median of $30.07 for the same occupations. Electricians: $39.37/hr; Plumbers: $48.86/hr. These are published employee wages, not contractor quotes; a contractor's billed hourly rate adds overhead, insurance, equipment and profit, so ask for trade-specific pricing in each bid.
Do I need a building permit for home renovations in Brooklyn Park?
Most significant renovations in Brooklyn Park, MN require building permits. HammerIO uses a modeled permit allowance of about $1,158; actual fees depend on the local fee schedule and project scope. Projects involving structural changes, electrical rewiring, plumbing modifications, or additions almost always require permits. Cosmetic updates like interior painting, replacing fixtures, or installing new flooring typically do not.
How does Brooklyn Park's cost of living affect construction costs?
HammerIO's model assigns Brooklyn Park a cost of living index of 103 (national baseline = 100). Higher-cost areas tend to have higher labor rates, material delivery costs, and permit fees. The model's material cost index for Brooklyn Park is 101, an estimate of regional material pricing rather than a published local statistic.
What are the most popular home improvement projects in Brooklyn Park?
HammerIO highlights Roof Replacement, Interior Painting, Room Addition as common projects to budget for in Brooklyn Park, MN; this is a planning shortlist, not survey data. Resale cost recovery varies widely by project type, scope, and local market, so compare kitchen, bathroom, and roof budgets against local home values and buyer expectations before choosing upgrades.

Related Calculators