Creator & Field Estimator

Rowan Ashby

Hammerio was built by Rowan Ashby, a residential construction estimator and former framing carpenter who wanted fast, job-site-ready material takeoff calculators that respect actual nominal-vs-actual lumber dimensions, compaction loss, and cut waste.

RA

Rowan Ashby

Founder & Lead Construction Estimator

Focus: Concrete, Framing, Roofing & Sitework Takeoffs

Anyone who has ever come up four bags short on a Saturday concrete pour or ordered drywall sheets using simple room square footage without accounting for window and door layout knows the difference between textbook geometry and job-site math. A “2x4” is 1.5 by 3.5 inches, an 80-pound bag of pre-mixed concrete yields 0.60 cubic feet (not 0.75), and a 7/12 hip roof requires a very different waste allowance than a simple 4/12 gable.

I started Hammerio as a collection of clean, phone-friendly takeoff sheets I could pull up in the truck without wading through pop-up contractor lead forms. Every calculator on Hammerio separates net geometric volume/area from gross order quantity with explicit waste percentages, bag yields, and unit cost breakdowns.

Code & Trade StandardsInternational Residential Code (IRC) framing/stair rules, American Concrete Institute (ACI) slab thickness guidelines, National Roofing Contractors Association (NRCA) pitch multipliers, and NWFA flooring waste allowances.
Material Pricing BenchmarksProducer Price Index (PPI) construction material series (BLS) combined with regional retail and supply-yard unit price ranges.

How Hammerio Calculates Material Takeoffs

1. Nominal vs. Actual Material Dimensions

Decking, framing, paver, and tile calculators account for real dressed dimensions, kerf/joint spacing, and standard stock lengths (8 ft, 10 ft, 12 ft, 16 ft) so you don't under-order boards due to nominal sizing myths.

2. Explicit Waste & Compaction Multipliers

Gravel, mulch, and topsoil settles under compaction; diagonal tile and hip roofs generate off-cut waste. Every Hammerio tool shows both the exact net measurement and the recommended order quantity including 5%–15% waste.

3. Always Verify Local Building Codes

Frost depth, live/dead load snow ratings, joist spans, and footing widths are governed by your local municipal building department. Always check local amendments to the IRC before cutting or pouring.

Spot a Trade Formula or Yield We Should Adjust?

If you have feedback on bag yields, stud spacing multipliers, or regional material cost ranges, drop us a note.