Ready-Mix Concrete Cost & Calculator

Ready-mix concrete is batched at a plant and delivered by truck for large pours. It offers consistent quality, proper mix ratios, and is the most cost-effective option for projects requiring 1+ cubic yards.

Unit Price

$140.00

per cubic yard

Labor Cost

$65.00

per cubic yard

Durability

50

years lifespan

Sustainability

2/5

Below Average

Category: Concrete
Range: $110.00$180.00/cubic yard
Waste Factor: 5%
Avg Project: $4,200

Ready-Mix Concrete Cost Calculator

1 cubic yard1,000 cubic yards

Order quantity: 105 cubic yards (100 + 5% waste)

Material Cost

$14,700

incl. $700 waste buffer

Labor Cost

$6,825

Total Estimated Cost

$21,525

Based on 105 cubic yards at $140.00/cubic yard + $65.00/cubic yard labor. Actual costs vary by location and supplier.

Specifications

Compressive Strength3,000-4,000 psi
Slump4-5 inches
Cure Time (full)28 days
Weight~3,900 lbs/cu yd

Price Comparison with Alternatives

MaterialPriceDurabilitySustainabilityCost/Year
Ready-Mix Concrete (current)$140.00/cubic yard50 yrs2/5$2.80
Bagged Concrete Mix$6.50/80-lb bag50 yrs2/5$0.13
Fiber-Reinforced Concrete$155.00/cubic yard60 yrs2/5$2.58
Stamped Concrete$16.00/sq ft25 yrs2/5$0.64

Cost/Year = unit price divided by expected lifespan. Lower cost/year indicates better long-term value. Note: units may differ between materials.

Best Uses

  • Foundations
  • Driveways
  • Sidewalks
  • Patios

Material Details

Average Project Cost

$4,200

Typical project using this material

Sustainability Rating

Below Averageconsider greener alternatives

Waste Factor

5%

Order 5% extra to account for cuts, breakage, and fitting

Ready-Mix Concrete: Complete Buying Guide 2026

Ready-mix concrete is batched at a plant and delivered by truck for large pours. It offers consistent quality, proper mix ratios, and is the most cost-effective option for projects requiring 1+ cubic yards. In 2026, ready-mix concrete prices average $140.00 per cubic yard, with a typical range of $110.00 to $180.00 depending on your region, supplier relationships, and order quantity.

When budgeting for a project using ready-mix concrete, factor in approximately 5% additional material for waste, plus labor costs averaging $65.00 per cubic yard for professional installation. A typical project using this material runs approximately $4,200 including both materials and labor.

With an expected lifespan of 50 years, ready-mix concrete represents a cost of approximately $2.80 per cubic yard per year of service life. This exceptional longevity makes it one of the most cost-effective materials when measured over its full lifespan.

Explore All 100 Construction Materials

Compare prices, specs, and sustainability ratings across lumber, concrete, steel, roofing, insulation, flooring, and more.

View All Materials

Frequently Asked Questions

Related Calculators