Kitchen Backsplash Installation in Thornton, CO — Costs $643 to $5,362
What does kitchen backsplash installation cost in Thornton? Average $1,930, ranging $643–$5,362. Labor runs $32.99/hr locally — 7% above the national average. Free breakdown with material + labor split.
Thornton, CO Market
+7% vs nationalLabor Rate
$32.99/hr
Material Index
105
Avg Permit Cost
$1,487
Median Home Price
$419,586
Thornton is a mid-sized city in Colorado with a healthy pool of local contractors. Homeowners generally have several options to compare for a kitchen backsplash installation, which helps keep pricing competitive. Costs in Thornton run slightly above the national average, though the gap is modest enough that smart material choices and timing can close it. The median home in Thornton is valued at $419,586, putting this project at about 0.5% of home value — a moderate investment with a projected 55% ROI.
Low Estimate
$643
National: $600
Mid-Range
$1,930
National: $1,800
High End
$5,362
National: $5,000
Per Sq Ft
$27
National: $25
Kitchen Backsplash Installation Cost Calculator for Thornton
Adjusted for Thornton's labor rate ($32.99/hr) and material costs (index 105).
Mid-grade materials, good quality fixtures, standard options.
Estimated Total in Thornton
$1,930
Based on 200 sq ft at mid quality, adjusted for Thornton market rates.
Local Cost Breakdown
At Thornton's average rate of $32.99/hr (10% above national avg)
Material cost index 105 (5% above national baseline of 100)
Kitchen Backsplash Installation vs. Home Value in Thornton
| Metric | Thornton | National Avg |
|---|---|---|
| Kitchen Backsplash Installation (Mid-Range) | $1,930 | $1,800 |
| Median Home Price | $419,586 | $350,000 |
| Project as % of Home Value | 0.5% | 0.5% |
| Estimated ROI | 55% | 55% |
| Median Household Income | $63,487 | $75,000 |
What Affects the Price in Thornton
- 1Local labor rates ($32.99/hr in Thornton)
- 2Material cost index (105 vs national 100)
- 3Tile material
- 4Pattern complexity
- 5Square footage
- 6Grout type
Popular Upgrades
- Subway tile
- Mosaic glass
- Peel-and-stick for DIY
Other Projects in Thornton, CO
Bathroom Addition
$48,479
Kitchen Remodel
$44,934
Master Bathroom Remodel
$30,026
Bathroom Remodel
$19,302
Second Story Addition
$214,967
Accessory Dwelling Unit (ADU) Construction
$161,225
Room Addition
$96,735
Home Addition
$85,788
Kitchen Backsplash Installation in Other Colorado Cities
Planning a Kitchen Backsplash Installation in Thornton
A kitchen backsplash installation typically doesn't require a permit in Thornton, which simplifies planning. However, always confirm with the local building department before starting, especially for structural changes. Expect the project to take 1-2 days to complete.
This is a beginner-friendly project that many Thornton homeowners tackle themselves. DIY can save you roughly $869 in labor costs, though you'll still need to source materials at local prices (material index: 105).
For the median Thornton household earning $63,487/year, this project at $1,930 represents a significant investment. Consider financing options or phasing the work to spread costs over time.
Kitchen Backsplash Installation — National Guide
See the full national cost guide with DIY tips, cost factors, and ROI analysis.
All Construction Costs in Thornton
View labor rates, material costs, and project estimates for Thornton, CO.
Explore All Project Cost Guides
Compare costs across 120+ home improvement projects in 3,636 cities nationwide.
View All Project Costs