Kitchen Backsplash Installation in New Bedford, MA — Costs $841 to $7,011

What does kitchen backsplash installation cost in New Bedford? Average $2,524, ranging $841–$7,011. Labor runs $45.44/hr locally — 40% above the national average. Free breakdown with material + labor split.

New Bedford, MA Market

+40% vs national

Labor Rate

$45.44/hr

Material Index

131

Avg Permit Cost

$2,104

Median Home Price

$444,214

New Bedford is a mid-sized city in Massachusetts with a healthy pool of local contractors. Homeowners generally have several options to compare for a kitchen backsplash installation, which helps keep pricing competitive. At 40% above the national average, New Bedford is one of the more expensive markets for home improvement — driven primarily by above-average labor rates in the region. The median home in New Bedford is valued at $444,214, putting this project at about 0.6% of home value — a moderate investment with a projected 55% ROI.

Low Estimate

$841

National: $600

Mid-Range

$2,524

National: $1,800

High End

$7,011

National: $5,000

Per Sq Ft

$35

National: $25

Duration: 1-2 days
DIY: Easy
Permits: Not Required
ROI: 55%

Kitchen Backsplash Installation Cost Calculator for New Bedford

Adjusted for New Bedford's labor rate ($45.44/hr) and material costs (index 131).

50 sq ft1,000 sq ft

Mid-grade materials, good quality fixtures, standard options.

Estimated Total in New Bedford

$2,524

Based on 200 sq ft at mid quality, adjusted for New Bedford market rates.

Local Cost Breakdown

Labor (45%)$1,136

At New Bedford's average rate of $45.44/hr (51% above national avg)

Materials (55%)$1,388

Material cost index 131 (31% above national baseline of 100)

Kitchen Backsplash Installation vs. Home Value in New Bedford

MetricNew BedfordNational Avg
Kitchen Backsplash Installation (Mid-Range)$2,524$1,800
Median Home Price$444,214$350,000
Project as % of Home Value0.6%0.5%
Estimated ROI55%55%
Median Household Income$111,078$75,000

What Affects the Price in New Bedford

  • 1Local labor rates ($45.44/hr in New Bedford)
  • 2Material cost index (131 vs national 100)
  • 3Tile material
  • 4Pattern complexity
  • 5Square footage
  • 6Grout type

Popular Upgrades

  • Subway tile
  • Mosaic glass
  • Peel-and-stick for DIY

Planning a Kitchen Backsplash Installation in New Bedford

A kitchen backsplash installation typically doesn't require a permit in New Bedford, which simplifies planning. However, always confirm with the local building department before starting, especially for structural changes. Expect the project to take 1-2 days to complete.

This is a beginner-friendly project that many New Bedford homeowners tackle themselves. DIY can save you roughly $1,136 in labor costs, though you'll still need to source materials at local prices (material index: 131).

With a median household income of $111,078, many New Bedford residents can budget for this project through savings. The mid-range cost of $2,524 represents 2% of the typical household's annual income.

Explore All Project Cost Guides

Compare costs across 120+ home improvement projects in 3,636 cities nationwide.

View All Project Costs

Frequently Asked Questions

Related Calculators