Kitchen Backsplash Installation in Lynn, MA — Costs $791 to $6,593

What does kitchen backsplash installation cost in Lynn? Average $2,373, ranging $791–$6,593. Labor runs $44.27/hr locally — 32% above the national average. Free breakdown with material + labor split.

Lynn, MA Market

+32% vs national

Labor Rate

$44.27/hr

Material Index

119

Avg Permit Cost

$1,592

Median Home Price

$435,000

In a smaller market like Lynn, Massachusetts, the pool of contractors specializing in kitchen backsplash installation may be more limited. Getting 3+ quotes is especially important to ensure fair pricing. At 32% above the national average, Lynn is one of the more expensive markets for home improvement — driven primarily by above-average labor rates in the region. The median home in Lynn is valued at $435,000, putting this project at about 0.5% of home value — a moderate investment with a projected 55% ROI.

Low Estimate

$791

National: $600

Mid-Range

$2,373

National: $1,800

High End

$6,593

National: $5,000

Per Sq Ft

$33

National: $25

Duration: 1-2 days
DIY: Easy
Permits: Not Required
ROI: 55%

Kitchen Backsplash Installation Cost Calculator for Lynn

Adjusted for Lynn's labor rate ($44.27/hr) and material costs (index 119).

50 sq ft1,000 sq ft

Mid-grade materials, good quality fixtures, standard options.

Estimated Total in Lynn

$2,373

Based on 200 sq ft at mid quality, adjusted for Lynn market rates.

Local Cost Breakdown

Labor (45%)$1,068

At Lynn's average rate of $44.27/hr (48% above national avg)

Materials (55%)$1,305

Material cost index 119 (19% above national baseline of 100)

Kitchen Backsplash Installation vs. Home Value in Lynn

MetricLynnNational Avg
Kitchen Backsplash Installation (Mid-Range)$2,373$1,800
Median Home Price$435,000$350,000
Project as % of Home Value0.5%0.5%
Estimated ROI55%55%
Median Household Income$55,000$75,000

What Affects the Price in Lynn

  • 1Local labor rates ($44.27/hr in Lynn)
  • 2Material cost index (119 vs national 100)
  • 3Tile material
  • 4Pattern complexity
  • 5Square footage
  • 6Grout type

Popular Upgrades

  • Subway tile
  • Mosaic glass
  • Peel-and-stick for DIY

Planning a Kitchen Backsplash Installation in Lynn

A kitchen backsplash installation typically doesn't require a permit in Lynn, which simplifies planning. However, always confirm with the local building department before starting, especially for structural changes. Expect the project to take 1-2 days to complete.

This is a beginner-friendly project that many Lynn homeowners tackle themselves. DIY can save you roughly $1,068 in labor costs, though you'll still need to source materials at local prices (material index: 119).

For the median Lynn household earning $55,000/year, this project at $2,373 represents a significant investment. Consider financing options or phasing the work to spread costs over time.

Explore All Project Cost Guides

Compare costs across 120+ home improvement projects in 3,636 cities nationwide.

View All Project Costs

Frequently Asked Questions

Related Calculators