Kitchen Backsplash Installation in High Point, NC — Costs $635 to $5,290
What does kitchen backsplash installation cost in High Point? Average $1,904, ranging $635–$5,290. Labor runs $39.37/hr locally — 6% above the national average. Free breakdown with material + labor split.
High Point, NC Market
+6% vs nationalLabor Rate
$39.37/hr
Material Index
85
Avg Permit Cost
$1,486
Median Home Price
$175,000
High Point is a mid-sized city in North Carolina with a healthy pool of local contractors. Homeowners generally have several options to compare for a kitchen backsplash installation, which helps keep pricing competitive. Costs in High Point run slightly above the national average, though the gap is modest enough that smart material choices and timing can close it. At a median home price of $175,000, homeowners in High Point should weigh the project cost (1.1% of home value) carefully against expected returns to avoid over-improving for the local market.
Low Estimate
$635
National: $600
Mid-Range
$1,904
National: $1,800
High End
$5,290
National: $5,000
Per Sq Ft
$26
National: $25
Kitchen Backsplash Installation Cost Calculator for High Point
Adjusted for High Point's labor rate ($39.37/hr) and material costs (index 85).
Mid-grade materials, good quality fixtures, standard options.
Estimated Total in High Point
$1,904
Based on 200 sq ft at mid quality, adjusted for High Point market rates.
Local Cost Breakdown
At High Point's average rate of $39.37/hr (31% above national avg)
Material cost index 85 (15% below national baseline of 100)
Kitchen Backsplash Installation vs. Home Value in High Point
| Metric | High Point | National Avg |
|---|---|---|
| Kitchen Backsplash Installation (Mid-Range) | $1,904 | $1,800 |
| Median Home Price | $175,000 | $350,000 |
| Project as % of Home Value | 1.1% | 0.5% |
| Estimated ROI | 55% | 55% |
| Median Household Income | $38,000 | $75,000 |
What Affects the Price in High Point
- 1Local labor rates ($39.37/hr in High Point)
- 2Material cost index (85 vs national 100)
- 3Tile material
- 4Pattern complexity
- 5Square footage
- 6Grout type
Popular Upgrades
- Subway tile
- Mosaic glass
- Peel-and-stick for DIY
Other Projects in High Point, NC
Bathroom Addition
$49,693
Kitchen Remodel
$43,467
Master Bathroom Remodel
$29,625
Bathroom Remodel
$19,045
Second Story Addition
$216,233
Accessory Dwelling Unit (ADU) Construction
$162,175
Room Addition
$97,305
Home Addition
$84,644
Kitchen Backsplash Installation in Other North Carolina Cities
Planning a Kitchen Backsplash Installation in High Point
A kitchen backsplash installation typically doesn't require a permit in High Point, which simplifies planning. However, always confirm with the local building department before starting, especially for structural changes. Expect the project to take 1-2 days to complete.
This is a beginner-friendly project that many High Point homeowners tackle themselves. DIY can save you roughly $857 in labor costs, though you'll still need to source materials at local prices (material index: 85).
In High Point, where the median household income is $38,000, a $1,904 project requires careful budgeting. Look into home improvement loans, HELOC options, or local grants that may be available in North Carolina.
Kitchen Backsplash Installation — National Guide
See the full national cost guide with DIY tips, cost factors, and ROI analysis.
All Construction Costs in High Point
View labor rates, material costs, and project estimates for High Point, NC.
Explore All Project Cost Guides
Compare costs across 120+ home improvement projects in 3,636 cities nationwide.
View All Project Costs