Kitchen Backsplash Installation in Franklin, TN — Costs $789 to $6,575

What does kitchen backsplash installation cost in Franklin? Average $2,367, ranging $789–$6,575. Labor runs $44.03/hr locally — 32% above the national average. Free breakdown with material + labor split.

Franklin, TN Market

+32% vs national

Labor Rate

$44.03/hr

Material Index

119

Avg Permit Cost

$1,510

Median Home Price

$620,000

In a smaller market like Franklin, Tennessee, the pool of contractors specializing in kitchen backsplash installation may be more limited. Getting 3+ quotes is especially important to ensure fair pricing. At 32% above the national average, Franklin is one of the more expensive markets for home improvement — driven primarily by above-average labor rates in the region. With a median home price of $620,000, this kitchen backsplash installation represents just 0.4% of typical home value — a relatively small investment that can significantly boost curb appeal or functionality.

Low Estimate

$789

National: $600

Mid-Range

$2,367

National: $1,800

High End

$6,575

National: $5,000

Per Sq Ft

$33

National: $25

Duration: 1-2 days
DIY: Easy
Permits: Not Required
ROI: 55%

Kitchen Backsplash Installation Cost Calculator for Franklin

Adjusted for Franklin's labor rate ($44.03/hr) and material costs (index 119).

50 sq ft1,000 sq ft

Mid-grade materials, good quality fixtures, standard options.

Estimated Total in Franklin

$2,367

Based on 200 sq ft at mid quality, adjusted for Franklin market rates.

Local Cost Breakdown

Labor (45%)$1,065

At Franklin's average rate of $44.03/hr (47% above national avg)

Materials (55%)$1,302

Material cost index 119 (19% above national baseline of 100)

Kitchen Backsplash Installation vs. Home Value in Franklin

MetricFranklinNational Avg
Kitchen Backsplash Installation (Mid-Range)$2,367$1,800
Median Home Price$620,000$350,000
Project as % of Home Value0.4%0.5%
Estimated ROI55%55%
Median Household Income$98,000$75,000

What Affects the Price in Franklin

  • 1Local labor rates ($44.03/hr in Franklin)
  • 2Material cost index (119 vs national 100)
  • 3Tile material
  • 4Pattern complexity
  • 5Square footage
  • 6Grout type

Popular Upgrades

  • Subway tile
  • Mosaic glass
  • Peel-and-stick for DIY

Planning a Kitchen Backsplash Installation in Franklin

A kitchen backsplash installation typically doesn't require a permit in Franklin, which simplifies planning. However, always confirm with the local building department before starting, especially for structural changes. Expect the project to take 1-2 days to complete.

This is a beginner-friendly project that many Franklin homeowners tackle themselves. DIY can save you roughly $1,065 in labor costs, though you'll still need to source materials at local prices (material index: 119).

With a median household income of $98,000, many Franklin residents can budget for this project through savings. The mid-range cost of $2,367 represents 2% of the typical household's annual income.

Explore All Project Cost Guides

Compare costs across 120+ home improvement projects in 3,636 cities nationwide.

View All Project Costs

Frequently Asked Questions

Related Calculators