Kitchen Backsplash Installation in Bellevue, WA — Costs $889 to $7,411
What does kitchen backsplash installation cost in Bellevue? Average $2,668, ranging $889–$7,411. Labor runs $48.94/hr locally — 48% above the national average. Free breakdown with material + labor split.
Bellevue, WA Market
+48% vs nationalLabor Rate
$48.94/hr
Material Index
136
Avg Permit Cost
$2,365
Median Home Price
$582,044
Bellevue is a mid-sized city in Washington with a healthy pool of local contractors. Homeowners generally have several options to compare for a kitchen backsplash installation, which helps keep pricing competitive. At 48% above the national average, Bellevue is one of the more expensive markets for home improvement — driven primarily by above-average labor rates in the region. With a median home price of $582,044, this kitchen backsplash installation represents just 0.5% of typical home value — a relatively small investment that can significantly boost curb appeal or functionality.
Low Estimate
$889
National: $600
Mid-Range
$2,668
National: $1,800
High End
$7,411
National: $5,000
Per Sq Ft
$37
National: $25
Kitchen Backsplash Installation Cost Calculator for Bellevue
Adjusted for Bellevue's labor rate ($48.94/hr) and material costs (index 136).
Mid-grade materials, good quality fixtures, standard options.
Estimated Total in Bellevue
$2,668
Based on 200 sq ft at mid quality, adjusted for Bellevue market rates.
Local Cost Breakdown
At Bellevue's average rate of $48.94/hr (63% above national avg)
Material cost index 136 (36% above national baseline of 100)
Kitchen Backsplash Installation vs. Home Value in Bellevue
| Metric | Bellevue | National Avg |
|---|---|---|
| Kitchen Backsplash Installation (Mid-Range) | $2,668 | $1,800 |
| Median Home Price | $582,044 | $350,000 |
| Project as % of Home Value | 0.5% | 0.5% |
| Estimated ROI | 55% | 55% |
| Median Household Income | $94,385 | $75,000 |
What Affects the Price in Bellevue
- 1Local labor rates ($48.94/hr in Bellevue)
- 2Material cost index (136 vs national 100)
- 3Tile material
- 4Pattern complexity
- 5Square footage
- 6Grout type
Popular Upgrades
- Subway tile
- Mosaic glass
- Peel-and-stick for DIY
Other Projects in Bellevue, WA
Bathroom Addition
$67,916
Kitchen Remodel
$61,678
Master Bathroom Remodel
$41,499
Bathroom Remodel
$26,678
Second Story Addition
$299,133
Accessory Dwelling Unit (ADU) Construction
$224,350
Room Addition
$134,610
Home Addition
$118,568
Kitchen Backsplash Installation in Other Washington Cities
Planning a Kitchen Backsplash Installation in Bellevue
A kitchen backsplash installation typically doesn't require a permit in Bellevue, which simplifies planning. However, always confirm with the local building department before starting, especially for structural changes. Expect the project to take 1-2 days to complete.
This is a beginner-friendly project that many Bellevue homeowners tackle themselves. DIY can save you roughly $1,201 in labor costs, though you'll still need to source materials at local prices (material index: 136).
With a median household income of $94,385, many Bellevue residents can budget for this project through savings. The mid-range cost of $2,668 represents 3% of the typical household's annual income.
Kitchen Backsplash Installation — National Guide
See the full national cost guide with DIY tips, cost factors, and ROI analysis.
All Construction Costs in Bellevue
View labor rates, material costs, and project estimates for Bellevue, WA.
Explore All Project Cost Guides
Compare costs across 120+ home improvement projects in 3,636 cities nationwide.
View All Project Costs