EV Charger Installation in Tulsa, OK — Costs $306 to $2,675
What does ev charger installation cost in Tulsa? Average $917, ranging $306–$2,675. Labor runs $22.21/hr locally — 24% below the national average. Free breakdown with material + labor split.
Tulsa, OK Market
-24% vs nationalLabor Rate
$22.21/hr
Material Index
80
Avg Permit Cost
$647
Median Home Price
$223,474
Tulsa is a mid-sized city in Oklahoma with a healthy pool of local contractors. Homeowners generally have several options to compare for a ev charger installation, which helps keep pricing competitive. Tulsa is well below the national average for renovation costs, making it a favorable market for homeowners considering a ev charger installation. At a median home price of $223,474, homeowners in Tulsa should weigh the project cost (0.4% of home value) carefully against expected returns to avoid over-improving for the local market.
Low Estimate
$306
National: $400
Mid-Range
$917
National: $1,200
High End
$2,675
National: $3,500
Per Sq Ft
$0
National: $0
EV Charger Installation Cost Calculator for Tulsa
Adjusted for Tulsa's labor rate ($22.21/hr) and material costs (index 80).
Mid-grade materials, good quality fixtures, standard options.
Estimated Total in Tulsa
$880
Based on 200 sq ft at mid quality, adjusted for Tulsa market rates.
Local Cost Breakdown
At Tulsa's average rate of $22.21/hr (26% below national avg)
Material cost index 80 (20% below national baseline of 100)
EV Charger Installation vs. Home Value in Tulsa
| Metric | Tulsa | National Avg |
|---|---|---|
| EV Charger Installation (Mid-Range) | $917 | $1,200 |
| Median Home Price | $223,474 | $350,000 |
| Project as % of Home Value | 0.4% | 0.3% |
| Estimated ROI | 50% | 50% |
| Median Household Income | $47,177 | $75,000 |
What Affects the Price in Tulsa
- 1Local labor rates ($22.21/hr in Tulsa)
- 2Material cost index (80 vs national 100)
- 3Level 1 vs Level 2 charger
- 4Electrical panel capacity
- 5Distance from panel to garage
- 6Dedicated circuit
Popular Upgrades
- 48A Level 2 smart charger
- Load management system
- Outdoor weatherproof outlet
Other Projects in Tulsa, OK
Whole House Generator Installation
$11,597
HVAC System Replacement
$9,314
Whole House Plumbing Repiping
$7,612
Spray Foam Insulation
$6,137
Second Story Addition
$154,033
Accessory Dwelling Unit (ADU) Construction
$115,525
Room Addition
$69,315
Home Addition
$61,852
EV Charger Installation in Other Oklahoma Cities
Planning a EV Charger Installation in Tulsa
Building permits are typically required for a ev charger installation in Tulsa. The average permit fee in this area is $647, though costs vary based on project scope. Permit fees in this market are above average — factor them into your total budget. Plan for 3-6 hours from start to finish.
A ev charger installation is a complex project best left to licensed professionals. In Tulsa, skilled contractors charge an average of $22.21/hr, and the specialized nature of this work means cutting corners on labor can lead to costly rework.
In Tulsa, where the median household income is $47,177, a $917 project requires careful budgeting. Look into home improvement loans, HELOC options, or local grants that may be available in Oklahoma.
EV Charger Installation — National Guide
See the full national cost guide with DIY tips, cost factors, and ROI analysis.
All Construction Costs in Tulsa
View labor rates, material costs, and project estimates for Tulsa, OK.
Explore All Project Cost Guides
Compare costs across 120+ home improvement projects in 3,636 cities nationwide.
View All Project Costs