EV Charger Installation in High Point, NC — Costs $451 to $3,946

What does ev charger installation cost in High Point? Average $1,353, ranging $451–$3,946. Labor runs $39.37/hr locally — 13% above the national average. Free breakdown with material + labor split.

High Point, NC Market

+13% vs national

Labor Rate

$39.37/hr

Material Index

85

Avg Permit Cost

$1,486

Median Home Price

$175,000

High Point is a mid-sized city in North Carolina with a healthy pool of local contractors. Homeowners generally have several options to compare for a ev charger installation, which helps keep pricing competitive. Costs in High Point run slightly above the national average, though the gap is modest enough that smart material choices and timing can close it. At a median home price of $175,000, homeowners in High Point should weigh the project cost (0.8% of home value) carefully against expected returns to avoid over-improving for the local market.

Low Estimate

$451

National: $400

Mid-Range

$1,353

National: $1,200

High End

$3,946

National: $3,500

Per Sq Ft

$0

National: $0

Duration: 3-6 hours
DIY: Hard
Permits: Required
ROI: 50%

EV Charger Installation Cost Calculator for High Point

Adjusted for High Point's labor rate ($39.37/hr) and material costs (index 85).

50 sq ft1,000 sq ft

Mid-grade materials, good quality fixtures, standard options.

Estimated Total in High Point

$1,299

Based on 200 sq ft at mid quality, adjusted for High Point market rates.

Local Cost Breakdown

Labor (60%)$812

At High Point's average rate of $39.37/hr (31% above national avg)

Materials (40%)$541

Material cost index 85 (15% below national baseline of 100)

EV Charger Installation vs. Home Value in High Point

MetricHigh PointNational Avg
EV Charger Installation (Mid-Range)$1,353$1,200
Median Home Price$175,000$350,000
Project as % of Home Value0.8%0.3%
Estimated ROI50%50%
Median Household Income$38,000$75,000

What Affects the Price in High Point

  • 1Local labor rates ($39.37/hr in High Point)
  • 2Material cost index (85 vs national 100)
  • 3Level 1 vs Level 2 charger
  • 4Electrical panel capacity
  • 5Distance from panel to garage
  • 6Dedicated circuit

Popular Upgrades

  • 48A Level 2 smart charger
  • Load management system
  • Outdoor weatherproof outlet

Planning a EV Charger Installation in High Point

Building permits are typically required for a ev charger installation in High Point. The average permit fee in this area is $1,486, though costs vary based on project scope. Permit fees in this market are above average — factor them into your total budget. Plan for 3-6 hours from start to finish.

A ev charger installation is a complex project best left to licensed professionals. In High Point, skilled contractors charge an average of $39.37/hr, and the specialized nature of this work means cutting corners on labor can lead to costly rework.

In High Point, where the median household income is $38,000, a $1,353 project requires careful budgeting. Look into home improvement loans, HELOC options, or local grants that may be available in North Carolina.

Explore All Project Cost Guides

Compare costs across 120+ home improvement projects in 3,636 cities nationwide.

View All Project Costs

Frequently Asked Questions

Related Calculators